Office Dilapidations: 6 Costly Mistakes at Lease End (UK)

Writer: Squaredot
Squaredot
3 hours ago
7 min read

What are office dilapidations, and how do you stop them wrecking your lease end budget? Here are the six mistakes that cost UK tenants most, and the fix for each one.

Your lease ends in two years. The board is asking whether to stay, move or take less space. Then a document lands from the landlord's surveyor. It lists every scuffed wall, every partition you added and every worn carpet tile, with a price next to each. Nobody budgeted for it.

This guide explains office dilapidations in plain English: what they are, the six mistakes that catch tenants out, the dates that matter, and how the cost should feed into your decision.

Our position, so you can weigh it. Squaredot is a workplace interior design consultancy. We are not a law firm, a surveyor or a fit out contractor. This is a general guide for England and Wales, not legal advice. Your lease decides what you owe, so take advice from a chartered building surveyor and your solicitor.

What are office dilapidations?

The Royal Institution of Chartered Surveyors describes dilapidations as breaches of lease covenants that relate to the condition of a property, in its consumer guide to dilapidations. In practice that usually means three kinds of promise you made when you signed.

  • Repair. Keeping the space in the condition the lease requires.

  • Redecoration. Repainting and refreshing at the times the lease sets out.

  • Reinstatement. Removing the alterations you made and putting the space back as it was.

Near the end of the lease the landlord, or the landlord's surveyor, sets out the alleged breaches in a document called a Schedule of Dilapidations. If the work is not complete before the lease ends, RICS says the landlord can claim damages from you.

Office kitchen area in a modern open plan office

Every kitchen, meeting room and partition you added during the lease is a possible reinstatement item.

What can an office dilapidations claim include?

It is rarely just the cost of the building work. This table combines the basics from RICS with the extra items that property consultancy Carter Jonas warns tenants about.

Item

What it means

Source

Repairs and redecoration

Putting right breaches of the repairing and decorating covenants

RICS

Reinstatement

Removing your alterations if the landlord requires it

RICS

Landlord's surveyor fees

Most leases let the landlord recover the cost of preparing and serving the schedule

Carter Jonas

Consequential losses

Lost rent, void rates and service charge

Carter Jonas

Sources: the RICS consumer guide linked above and the Carter Jonas tenant guide to dilapidations.

Mistake 1: treating dilapidations as a lease end problem

Most tenants first think about dilapidations when the schedule arrives. By then the options have narrowed. RICS notes that it may be difficult to decide whether to complete the work before the end of the lease, and unfinished work can become a damages claim.

Once the lease has ended, the timetable is tight. RICS says the landlord's Quantified Demand, which sets out the claim in more detail, should reach you within 56 days after the end of the lease. You are then expected to respond within 56 days of receiving it.

Timeline showing two 56 day steps after lease end: the landlord's claim, then the tenant's response

How to avoid it. Ask a chartered building surveyor for an early assessment of your likely liability, well before your break date or expiry. That gives you time to choose between doing the works yourself and negotiating a settlement.

Mistake 2: not knowing what your lease really requires

Two leases in the same building can carry very different obligations. Savills advises tenants to check whether the lease requires reinstatement to an open plan Category A layout, or the handing back of the fitted space in full repair. It also warns that wording such as modern equivalent or new can impose onerous obligations (Savills, July 2023).

How to avoid it. Ask your solicitor for a one page summary of the repair, decoration and reinstatement clauses, plus any licences for alterations, while there is still time to act on it.

Mistake 3: forgetting the alterations you made

Offices change over the life of a lease. A meeting room is added, a kitchen is moved, cabling is run through the ceiling. RICS says your landlord may serve you with a notice to reinstate the alterations you have made.

How to avoid it. Keep a simple register of every alteration, the licence that approved it and what that licence says about removal. If you are weighing a refurbishment now, design it with the exit in mind, and read refurbish vs relocate before you commit.

Modern open plan office interior

Do you know how your office is really performing?

Dilapidations are one number in the stay, move or resize decision. The Workplace Design Scorecard shows where your current office is helping you and where it is holding you back.



Mistake 4: having no record of condition

If the space was already tired when you moved in, you should not have to hand it back in better condition than you found it. Carter Jonas notes that a schedule of condition, appended to the lease, can reduce your repairing liability. It also advises tenants to keep records of correspondence reporting disrepair to the landlord.

How to avoid it. Find the schedule of condition from the start of your lease, if there is one. For your next lease, ask for one, with dated photographs.

Mistake 5: accepting the landlord's figure as the bill

A Schedule of Dilapidations is a claim, not an invoice. Property consultancy Allsop lists the landlord's cost estimates among the common areas of dispute and notes that inflated rates are often used. Its list also includes whether the tenant's alterations really have to be reinstated, and the distinction between repair and improvement (Allsop, August 2024).

The law also sets a ceiling. Under section 18(1) of the Landlord and Tenant Act 1927, damages for breach of a repairing covenant cannot exceed the amount by which the value of the landlord's interest has been reduced. No damages are recoverable for failing to leave the premises in repair if they are to be pulled down, or structurally altered in a way that makes the repairs valueless, at or shortly after the end of the tenancy. So the landlord's plans for the building matter.

How to avoid it. Have your own surveyor review the schedule line by line. RICS also points to the Dilapidations Protocol, published by the Ministry of Justice, which expects both sides to consider settling the dispute without going to court.

Mistake 6: leaving office dilapidations out of the stay or move decision

This is the mistake closest to our own work. Boards compare rent, rates and fit out cost for each option, then discover the exit bill later. Leaving costs money. Staying does not make the liability disappear either. It usually moves it to the end of the next lease.

If you plan to use a break clause, the stakes are higher. Carter Jonas warns that breaching your repairing or reinstatement obligations could invalidate the break. Our guide to office lease break clause mistakes covers the conditions to check.

How to avoid it. Put an estimated dilapidations figure into every option in your business case, next to the office fit out cost per sq ft of the new or refurbished space. It is also the moment to test whether you need the same amount of space at all, a question we cover in your office is 42% full.

Six mistakes and how to fix them

Checklist of six fixes for office dilapidations mistakes, from starting early to putting the cost into the stay or move decision

Mistake

Fix

1. Leaving it to lease end

Get an early assessment from a chartered building surveyor

2. Not knowing the lease

Get a one page summary of the repair, decoration and reinstatement clauses

3. Forgetting alterations

Keep a register of alterations and licences

4. No record of condition

Find or create a schedule of condition with photographs

5. Accepting the landlord's figure

Have your own surveyor review it and check the statutory cap

6. Leaving it out of the decision

Put the cost into every stay, move or resize option

Who this guide is for, and who it is not for

It is for finance, property, facilities and operations leaders in England or Wales with an office lease break or expiry in the next few years, who need to understand the exit cost before choosing whether to stay, move or resize.

It is not for landlords. It is not for tenants already in a formal dispute, who need a solicitor now. And it is not for leases in Scotland or Northern Ireland, where the rules differ.

Frequently asked questions

What are dilapidations in an office lease?

They are breaches of the lease covenants about the condition of the property, usually repair, redecoration and reinstatement of alterations. The landlord can require you to put them right, or claim damages at the end of the lease.

How much do office dilapidations cost?

There is no reliable average, because the figure depends on your lease, the size and condition of the space and the alterations you made. Be wary of any rule of thumb per square foot. Ask a chartered building surveyor for an assessment based on your own lease.

Can we negotiate a dilapidations claim?

Yes. A Schedule of Dilapidations is the landlord's claim, and the items, the rates and the need for reinstatement are commonly disputed. Section 18(1) of the Landlord and Tenant Act 1927 also caps damages for disrepair at the reduction in the value of the landlord's interest.

When should we start planning for dilapidations?

As soon as you start thinking about your lease event. The earlier you know the likely figure, the more options you have: do the works yourself, negotiate a settlement, or build the cost into a move.

Do we have to remove our fit out when we leave?

It depends on your lease and any licences for alterations. RICS says the landlord may serve notice requiring you to reinstate the alterations you have made. Check what each licence says before you assume either way.

The short version

Office dilapidations are predictable if you look early. Know what the lease requires, record what you changed, test the landlord's figure, and put the cost into your stay, move or resize decision before the board signs anything.

If you want to see how your current office measures up before that decision, take the Workplace Design Scorecard. And if you are still deciding what to measure first, read why a workplace study should come before your next lease.