Office Relocation: 7 Costly Mistakes UK Firms Make (2026)

Writer: Squaredot
Squaredot
24 minutes ago
6 min read

An office relocation takes most of a year. Most firms give it a few months. Here are the seven mistakes that follow, and how to avoid each one.


Your lease ends in a year. It feels like plenty of time, so the move sits at the bottom of the list. Then an agent tells you the building you like will not be ready, your landlord sends a schedule of repairs, and the board wants to know why the budget has doubled.


This guide covers how long an office relocation really takes, the seven mistakes UK firms make most often, the costs that miss the budget and the order to do things in. The lease points apply to England and Wales, and none of this is legal advice.


How long does an office relocation take?

The short answer: 23 to 40 weeks from starting the search to moving in, and longer if you want to study how your current office is used first.


That range comes from adding up the indicative stage lengths in Strutt and Parker's guide to moving premises. The total is our arithmetic, not theirs.


Stage

Indicative time

Search

6 to 8 weeks

Negotiate

2 to 4 weeks

Legal process

6 to 8 weeks

Fit out

8 to 14 weeks

Move

1 to 6 weeks


Bar chart of indicative office relocation stage lengths from Strutt and Parker: search 6 to 8 weeks, negotiate 2 to 4 weeks, legal process 6 to 8 weeks, fit out 8 to 14 weeks, move 1 to 6 weeks, a total of 23 to 40 weeks

Strutt and Parker says a workplace audit "can add two to three months" and that finding a new location "can easily take up to 12 months". That is why the advice below starts so early.


The 7 office relocation mistakes

1. Starting with months left, not years

Strutt and Parker says many businesses first get in touch with "three to six months left" on the lease. Set that against a 23 to 40 week process and the problem is obvious. You end up taking whatever building is available and paying whatever it costs to make it ready in time.


How to avoid it: start 18 months before the lease ends. A panel at fit out firm Oktra called 18 months "the absolute minimum". As an illustrative example, a lease ending on 30 June 2028 means starting by the end of December 2026.


2. Moving your old headcount into a new building

The most expensive mistake is also the quietest. You count your people, multiply by a rule of thumb and go looking for that much space. Nobody checks how many desks are used on a normal Tuesday, so you sign for space you will not fill.


How to avoid it: measure first. Compare the options in our review of office utilisation study methods, then size the brief using office space per person in the UK. Allow the two to three months a study can add.


A modern open plan office with rows of desks and task chairs

3. Signing the lease before testing the layout

A floor can have the right square footage and still be the wrong building. Columns, cores, window lines and the shape of the floor decide how many meeting rooms, quiet rooms and team areas fit. In our view too many firms find this out after the lease is signed.


How to avoid it: ask a designer to test your brief on the shortlisted floors before you commit. It is a small piece of work that can rule a building in or out. Our guide to the best office layout for hybrid working shows what to test for.


Before you brief an agent, it helps to know how other organisations are using their offices. Our Dynamic Workplace Report surveyed 80 businesses and 30,000 people on how they work.

4. Budgeting for the new office and forgetting the old one

Most relocation budgets cover rent, fit out and furniture. The costs of leaving are often missing. Lewis Silkin's legal director Tom Merrick, writing about head office moves, lists dilapidations, any surrender premium or break penalty, a rent deposit on the new lease and stamp duty land tax among the costs to plan for.


We would add a fifth: the weeks when you pay rent and service charge on both buildings while the new one is fitted out.


Checklist of five office move costs that often miss the budget: dilapidations on the old office, break penalty or surrender premium, rent deposit on the new lease, stamp duty land tax, and rent and service charge on both buildings

How to avoid it: get a dilapidations surveyor to look at the old office early, and put every line above in the budget with a figure against it. Our guide to office dilapidations mistakes explains what a claim can include.


5. Missing the break or notice date

Your exit date is not always the day the lease ends. A break option has its own notice period, and Lewis Silkin warns that break conditions "would need to be analysed carefully and complied with". Get it wrong and you can be tied to the old building after you have committed to the new one.


How to avoid it: have a solicitor read the lease before you do anything else, and put the notice dates in the project plan. We cover the detail in office lease break clause mistakes.


6. Underestimating the fit out

Strutt and Parker puts an average fit out at 12 weeks and says larger, traditionally procured projects "can easily take six months plus". That is before approvals. Lewis Silkin lists a licence for alterations among the documents to agree with the new landlord, and notes that landlord's works may need to finish before the lease is signed.


How to avoid it: agree the design and the route to build it before the legal work completes, so the contractor can start the day you get access. See design and build vs traditional fit out and our office fit out cost per sq ft guide.


A modern office interior with glass walled rooms beside an open plan area

7. Leaving connectivity until the end

A finished office with no internet is not an office. Lewis Silkin says telecoms lead in times "can take several months", and that negotiating a wayleave, the agreement that lets a provider bring cables into the building, can add more.


How to avoid it: order lines as soon as the building is chosen, not when the furniture arrives. Plan meeting room technology with the design, not after it.


The seven mistakes at a glance

Mistake

What it costs you

The fix

Starting late

Choice of building and negotiating strength

Start 18 months out

Moving old headcount

Rent on space you do not use

Measure how the office is used

No layout test

A floor that does not fit the brief

Test the layout before signing

Forgetting exit costs

An unplanned bill at the old office

Budget all five leaving costs

Missing notice dates

Being tied to two leases

Solicitor reads the lease first

Short fit out programme

A late move and extra rent

Design before legals complete

Late connectivity

An office you cannot work in

Order lines when you choose


Should you relocate at all?

Sometimes the best office relocation is the one you do not do. If the building works and only the layout is wrong, a redesign in place may cost less than a move. We compare the two in refurbish vs relocate. If you are staying, read office lease renewal mistakes before you talk to the landlord.


Who this guide is for, and who it is not for

For: finance, property, operations and facilities leaders with a lease break or expiry in the next two years, who have not yet decided whether to stay, move or resize.


Not for: firms moving into a serviced office next month, where the provider handles most of this. It is also not a guide to removals, crates and move day itself.


Office relocation: the order of work

  1. Read the lease. Confirm the end date, any break option and the notice dates.

  2. Measure the current office. Find out how the space is used before you set a size.

  3. Write the brief. People, space types, location, budget and the date you must be in.

  4. Search and test. Shortlist buildings and test the layout on each floor.

  5. Design, agree and build. Finish the design during the legal work, then fit out and move.


Work back from the day you need to be in. Lewis Silkin gives the same advice: set a target date for occupation, then work back.


FAQ

How long does an office relocation take in the UK?

On Strutt and Parker's indicative figures, 23 to 40 weeks from search to move, plus two to three months if you carry out a workplace audit first. Larger projects take longer.


When should we start planning an office move?

About 18 months before the lease ends. Oktra's panel called 18 months the absolute minimum, and Strutt and Parker says finding a location alone can take up to 12 months.


What costs do companies forget when moving office?

Dilapidations on the old office, any break penalty or surrender premium, the rent deposit, stamp duty land tax, and the overlap when you pay for two buildings at once.


Do we need a workplace consultant to relocate?

Not always. A small firm moving into a ready fitted floor may not. If you are unsure how much space you need, or the lease is a large commitment, an independent study and a tested design usually pay for themselves in space you do not rent.


The bottom line

An office relocation goes wrong long before move day. It goes wrong when the clock starts late, when the size is guessed and when the cost of leaving is left out. Start 18 months ahead, measure before you search and test the design before you sign. That is how you get an office people want to use, at a size you are happy to pay for.


See how 80 businesses and 30,000 people use their offices before you decide how much space to take.